JRobert Oppenheimer
Member
- Joined
- May 11, 2025
- Messages
- 13
My sister and her husband are renovating our old home (she's the youngest so she gets the perks you know that lol). Anyway, for reference there's a garage below two heated bedrooms. The contractor wants to put the vapor barrier directly under the subfloor, then Rockwool between joists, and plywood last. I always thought the vapor barrier went after insulation, not before. Is this correct for this kind of setup?